Kitchen remodeling · Bay Area & Napa Valley
New cabinets and counters, cabinet refacing, open layouts, and all-electric kitchens with induction cooking. We handle the design, the permit and the build, and you deal with one licensed contractor the whole way.
The biggest cost decision is whether the layout changes. Keeping the sink, range and walls where they are leaves more of the budget for cabinets, counters and appliances.
Best for: a layout that works but looks dated
New cabinets, countertops, backsplash, sink, faucet and lighting in the existing footprint, with the plumbing and gas lines left in place. In San José, new countertops alone need no permit; San Francisco requires one to replace kitchen fixtures, and Oakland for any kitchen remodel.
Best for: sound cabinet boxes in a layout that works
We keep your cabinet boxes and replace the doors, drawer fronts and hardware, with new veneer over the exposed frames. It’s often paired with new counters, a sink and lighting. In San José, cabinet resurfacing is cosmetic work that needs no permit.
Best for: a kitchen that doesn’t work for how you cook
A new layout with cabinets, appliances, flooring, lighting and electrical. Moving the sink or range means new plumbing, gas or wiring, a building permit, and California’s energy-code lighting rules for the remodeled kitchen.
Best for: a closed-off kitchen
Removing or opening the wall to the living or dining room. A bearing wall needs an engineered beam and a permit, and walls often hide plumbing vents, ducts or wiring that have to be rerouted.
Best for: replacing a gas range, or planning ahead
An induction range usually needs a new 240-volt circuit, and some homes need a panel upgrade. Several local energy providers pay rebates when induction replaces gas; they’re listed by region below.
Published figures for the San Francisco market run from about $32,000 for an update that keeps the layout to about $98,000 for a midrange full remodel. Cabinets, appliances and layout changes drive most of the difference, and we price your kitchen after a free consultation.
That’s the San Francisco figure in the Remodeling 2025 Cost vs. Value Report (www.costvsvalue.com) for keeping the layout and cabinet boxes, with new shaker-style doors and drawer fronts (in effect, refacing), a new range and refrigerator, laminate counters, sink, faucet and resilient flooring.
An outdated kitchen rebuilt with 30 linear feet of semi-custom wood cabinets, a 3×5 ft island, laminate counters, a new range, vented hood, microwave and dishwasher, custom lighting and new flooring, per the Cost vs. Value Report. Stone counters and higher-end appliances raise the total.
Houzz’s 2026 Kitchen Trends Study found homeowners spent a median of $55,000 on a major remodel (at least all cabinets and appliances replaced), and $75,000 for kitchens of 250 sq ft or more. These are self-reported figures from Houzz users across the U.S.
© 2025 Zonda Media, a Delaware Corporation. Complete data from the Remodeling 2025 Cost vs. Value Report can be downloaded free at www.costvsvalue.com. These are published figures, not our quote. Other sources are listed at the bottom of this page.
One team, from measuring your kitchen to the final inspection.
We look at the kitchen, the plumbing, gas and electrical panel, and talk through how you cook, your budget and your timing.
We lay out the kitchen and help you choose cabinets, counters, appliances and lighting. Cabinets are often the longest lead item, so we order them early.
We prepare the drawings, including the lighting and energy forms California requires, submit them and schedule the inspections.
Demolition, rough plumbing and electrical, inspections, drywall, then cabinets, counters, backsplash and appliances.
We pass the final inspection, walk the finished kitchen with you and fix anything on your list.
“Good Guy Builders did a fantastic job on my bathroom remodel, so I hired them for a major kitchen upgrade. My wishlist included a multifunctional kitchen, and they delivered flawlessly. Good Guy Builders and their skilled team managed everything efficiently, providing daily updates and photos. The project stayed on budget, finished ahead of schedule, and the results are amazing.”
“GGB promptly responded when others didn’t. Their large team started work within weeks, executing our design effectively. They handled setbacks professionally, reducing our stress. We’re grateful and would hire them again!”
State law adds a few requirements once your project needs a permit. Here’s what applies as of November 2026.
Permits: Rules vary by city. In San José, new countertops and cabinet resurfacing need no permit, and swapping appliances or fixtures in place can use an online permit. San Francisco requires a permit to replace kitchen fixtures, and Oakland requires one for any kitchen remodel. Moving the sink or range, or changing walls, needs a building permit.
Lighting: Lights you replace must meet the energy code: certified high-efficacy fixtures, wall-mounted dimmers, and under-cabinet lights switched separately. Only the lighting you change has to comply.
Range hood: If an earlier permit required a range hood, its replacement must move at least 100 cubic feet per minute, or the airflow previously required if that’s higher.
Faucets and older fixtures: New kitchen faucets sold in California are capped at 1.8 gallons per minute. In homes built before 1994, final approval of a permitted remodel also requires replacing every noncompliant toilet, showerhead and faucet in the house.
Smoke and CO alarms: For a permitted job over $1,000, the city won’t sign off until the home has smoke alarms that meet current standards, plus carbon monoxide alarms if it has gas appliances, a fireplace or an attached garage.
Lead paint: In homes built before 1978, work that disturbs more than 6 sq ft of paint in a room must be done by an EPA-certified firm using lead-safe practices, and you get EPA’s Renovate Right pamphlet before work starts.
Down payment: A contractor can ask for no more than $1,000 or 10% of the contract price, whichever is less, and can’t take payment ahead of the work done or materials delivered.
Cities and counties add their own requirements, so we confirm what applies to your home before work starts. This is general information, not legal advice.
We work across four regions. Permit counters and electrification rebates differ from place to place, so here’s what to know in each.
San Jose, Santa Clara, Sunnyvale, Cupertino, Campbell, Los Gatos, Saratoga, Milpitas
In San José, cosmetic work such as new countertops, flooring, painting and cabinet resurfacing needs no permit. Swapping fixtures or appliances in the same locations, with new wiring or plumbing, can use the city’s online minor-remodel permit. Moving fixtures or changing walls, windows or framing needs plans. In Sunnyvale, Cupertino and other Silicon Valley Clean Energy cities, SVCE pays $500 ($750 for income-qualified customers) for induction cooking that replaces gas; apply before installation.
San Francisco, San Mateo, Palo Alto, Redwood City, Mountain View
San Francisco requires a permit to replace kitchen or bath fixtures. Since September 14, 2026, like-for-like, nonstructural kitchen and bath permits for houses and duplexes are filed online through PermitSF; remodels that change structure and need plans are filed in person. CleanPowerSF gives a $150 bill credit for permanently installed induction cooking if you’re on an electrification rate.
Fremont, Oakland, Walnut Creek, Pleasanton, Livermore
Oakland requires a building permit for every kitchen or bathroom remodel. Its online permit for remodels with no wall, window or exterior changes typically takes 3 days to 2 weeks, and homes built before 1978 need a lead-based paint work plan.
Napa, American Canyon, Yountville, St. Helena, Calistoga, Sonoma, Vallejo, Fairfield
The City of Napa reviews minor interior remodels at the counter through Express Review; projects that need a full plan review are reviewed within 21 business days, and all permits go through the NapaON portal. In unincorporated Sonoma County, nonstructural kitchen and bathroom remodels are over-the-counter permits. Sonoma Clean Power pays $500 plus a free cookware set for induction cooking.
The Remodeling 2025 Cost vs. Value Report (www.costvsvalue.com) puts a minor update of a 200 sq ft kitchen at $31,804 in the San Francisco market and a midrange full remodel at $97,667. Houzz’s national survey found a $55,000 median for a major kitchen remodel, and $75,000 for kitchens of 250 sq ft or more. We price your kitchen after a free consultation.
It depends on the city and the scope. In San José, new countertops and cabinet resurfacing need no permit, and replacing appliances or fixtures in place can use an online permit. San Francisco requires a permit to replace kitchen fixtures, and Oakland requires one for any kitchen remodel. Moving the sink or range, adding circuits or changing walls needs a permit.
It depends on the scope, the permit path and lead times, especially for cabinets. Permit time varies by city: Oakland’s online permit for remodels with no wall or window changes typically takes 3 days to 2 weeks, and the City of Napa reviews minor interior remodels at the counter. We’ll lay out a schedule for your project at the consultation.
Yes. Induction usually needs a dedicated 240-volt circuit, and an older electrical panel may need an upgrade, which we check at the consultation. Silicon Valley Clean Energy pays $500 ($750 for income-qualified customers) when induction replaces gas, Sonoma Clean Power pays $500 plus a cookware set, and CleanPowerSF gives a $150 bill credit.
Refacing makes sense when the cabinet boxes are solid and the layout works: we keep the boxes and replace the doors, drawer fronts and hardware, with new veneer over the frames. If you’re changing the layout, or the boxes are water-damaged or sagging, new cabinets are the better use of the money. We look at the boxes at the consultation and tell you which fits.
Often, yes. A load-bearing wall needs an engineered beam and a building permit. Walls also hide plumbing vents, ducts and wiring that may need rerouting, which affects the price.
Any lighting you replace must meet the state energy code: certified high-efficacy (JA8) fixtures, wall-mounted dimmers, and under-cabinet lights on their own switch. Only the lighting you change has to comply.
If the work disturbs more than 6 sq ft of painted surface in a room, federal rules require an EPA-certified firm, lead-safe work practices and EPA’s Renovate Right pamphlet before work starts. Oakland also requires a lead-based paint work plan with the permit.
California caps the down payment at $1,000 or 10% of the contract price, whichever is less, with no exception for special-order materials. After that, payments follow the contract’s schedule and can’t run ahead of the work completed.
Yes. We lay out the kitchen, help with selections, prepare the permit drawings and energy forms, schedule inspections and build through final approval.
Send a few details or call. We’ll talk through layout options, whether you’ll need a permit and a realistic budget.
Planning something else? Bathroom remodeling · All remodeling services · ADUs