Bathroom remodeling · Bay Area & Napa Valley
Full remodels, tub-to-shower conversions, primary bathrooms and accessible showers. We handle the design, the permit and the build, so one licensed contractor is responsible from demolition to final inspection.
Scope drives the price more than size does. Replacing fixtures where they sit costs far less than moving a toilet or a shower drain.
Best for: a bathroom that works but looks dated
New tile, vanity, toilet, shower fixtures and lighting, with the drains and supply lines left where they are. In San José, swapping fixtures in place can qualify for a simple online permit; San Francisco and Oakland require a permit for fixture replacements and remodels.
Best for: a bathroom that doesn’t fit how you live
Moving the shower, toilet or vanity, enlarging the room or adding a window. That means new drain and supply lines, usually new wiring, and a building permit with inspections before the walls are closed up.
Best for: a tub nobody uses
The tub comes out and a walk-in shower goes in, with a new valve, waterproofing, drain and glass. If it’s the only tub in the house, consider resale before removing it, since some buyers with young children want one.
Best for: aging in place, or someone with limited mobility
A zero-threshold shower, blocking in the walls for grab bars, a comfort-height toilet and wider clearances. A curbless shower usually needs the floor recessed or regraded so water drains toward it instead of into the room.
Published figures for the San Francisco market start at about $32,000 for a midrange update of a small bathroom. Your price depends on the layout, the tile and what’s behind the walls, and we’ll give you one after a free consultation.
That’s the San Francisco figure in the Remodeling 2025 Cost vs. Value Report (www.costvsvalue.com) for replacing every fixture in place: a new tub with a ceramic tile surround, a pressure-balanced shower valve, toilet, solid-surface vanity, medicine cabinet and tile floor.
The same 5×7 ft room made wheelchair-accessible in the Cost vs. Value Report: zero-threshold entry, a 36-inch door, a curbless tiled shower with a fold-out seat, a comfort-height toilet and a heated floor.
Expanding a 35 sq ft bathroom to 100 sq ft within the house and relocating every fixture, with a 42-inch shower, a freestanding soaking tub, a stone double vanity and a humidistat-controlled fan, per the Cost vs. Value Report.
Houzz’s 2026 Bathroom Trends Study found homeowners spent a median of $25,000 on a major bathroom remodel, and $30,000 for bathrooms of 100 sq ft or more. These are self-reported figures from Houzz users across the U.S.
© 2025 Zonda Media, a Delaware Corporation. Complete data from the Remodeling 2025 Cost vs. Value Report can be downloaded free at www.costvsvalue.com. These are published figures, not our quote. Other sources are listed at the bottom of this page.
One team, from the first visit to the final inspection.
We look at the room, the plumbing and the ventilation, and talk through what you want to change, your budget and your timing.
We lay out the room and help you choose tile, fixtures, the vanity and lighting, so the estimate is based on real products.
If the work needs a permit, we prepare the drawings, submit them to your city or county and schedule the inspections.
Demolition, plumbing and electrical rough-in, inspections, waterproofing and tile, then fixtures, glass and finishes.
We pass the final inspection, walk the finished bathroom with you and fix anything on your list.
“Good Guy Builders truly live up to their name. Their team is honest, respectful, and greatly enhanced our master bathroom renovation. They turned our vague ideas into reality with a methodical and thoughtful approach, exceeding our expectations.”
“Good Guy Builders did a fantastic job on my bathroom remodel, so I hired them for a major kitchen upgrade. My wishlist included a multifunctional kitchen, and they delivered flawlessly. Good Guy Builders and their skilled team managed everything efficiently, providing daily updates and photos. The project stayed on budget, finished ahead of schedule, and the results are amazing.”
State law adds a few requirements once your project needs a permit. Here’s what applies as of November 2026.
Permits: Rules vary by city. San José lets you put in new flooring without a permit and has an online permit for swapping fixtures in place. San Francisco requires a permit for fixture replacements and bathroom flooring, and Oakland requires one for any bathroom remodel. Moving fixtures or changing walls needs a building permit.
Older fixtures: If your home was built before 1994, the city won’t give final approval on a permitted remodel until every noncompliant fixture in the house is replaced: toilets over 1.6 gallons per flush, showerheads over 2.5 gallons per minute and faucets over 2.2.
New fixtures: Fixtures sold in California are capped at 1.28 gallons per flush for toilets, 1.8 gallons per minute for showerheads and 1.2 for bathroom faucets.
Exhaust fan: A replacement bathroom fan must meet the energy code’s ventilation rate: at least 50 cubic feet per minute when switched on, or 20 if it runs continuously.
Lighting: Lights you replace must meet the energy code, which calls for certified high-efficacy fixtures and at least one bathroom light on an occupancy or vacancy sensor.
Smoke and CO alarms: For a permitted job over $1,000, the city won’t sign off until the home has smoke alarms that meet current standards, plus carbon monoxide alarms if it has gas appliances, a fireplace or an attached garage.
Lead paint: In homes built before 1978, work that disturbs more than 6 sq ft of paint in a room must be done by an EPA-certified firm using lead-safe practices, and you get EPA’s Renovate Right pamphlet before work starts.
Down payment: A contractor can ask for no more than $1,000 or 10% of the contract price, whichever is less, and can’t take payment ahead of the work done or materials delivered.
Cities and counties add their own requirements, so we confirm what applies to your home before work starts. This is general information, not legal advice.
We work across four regions. Permit counters and rebates differ from place to place, so here’s what to know in each.
San Jose, Santa Clara, Sunnyvale, Cupertino, Campbell, Los Gatos, Saratoga, Milpitas
In San José, cosmetic work such as new countertops, flooring, painting and cabinet resurfacing needs no permit. Swapping fixtures or appliances in the same locations, with new wiring or plumbing, can use the city’s online minor-remodel permit. Moving fixtures or changing walls, windows or framing needs plans. Valley Water sends free water-saving showerheads and shower timers.
San Francisco, San Mateo, Palo Alto, Redwood City, Mountain View
San Francisco requires a permit to replace kitchen or bath fixtures. Since September 14, 2026, like-for-like, nonstructural kitchen and bath permits for houses and duplexes are filed online through PermitSF; remodels that change structure and need plans are filed in person. The SFPUC rebates up to $200 per toilet when a 0.8 gallon-per-flush model replaces one using 1.6 gallons or more; apply within 90 days of purchase.
Fremont, Oakland, Walnut Creek, Pleasanton, Livermore
Oakland requires a building permit for every kitchen or bathroom remodel. Its online permit for remodels with no wall, window or exterior changes typically takes 3 days to 2 weeks, and homes built before 1978 need a lead-based paint work plan.
Napa, American Canyon, Yountville, St. Helena, Calistoga, Sonoma, Vallejo, Fairfield
The City of Napa reviews minor interior remodels at the counter through Express Review; projects that need a full plan review are reviewed within 21 business days, and all permits go through the NapaON portal. In unincorporated Sonoma County, nonstructural kitchen and bathroom remodels are over-the-counter permits. City of Napa water customers can get free water-saving devices, including a 1.5 gallon-per-minute showerhead.
The Remodeling 2025 Cost vs. Value Report (www.costvsvalue.com) puts a midrange update of a 5×7 ft bathroom at $32,160 in the San Francisco market, an accessible version of the same room at $52,228, and an upscale remodel that enlarges the room to 100 sq ft at $97,394. Houzz’s national survey found a $25,000 median for a major bathroom remodel. We price your project after a free consultation.
Usually, if the work touches plumbing, wiring or walls. San José allows new flooring without a permit and has an online permit for swapping fixtures in place. San Francisco requires a permit to replace fixtures, and Oakland requires one for any bathroom remodel. Moving fixtures or changing walls needs a building permit, usually with plans.
It depends on the scope, the permit path and lead times for items like glass, vanities and tile. Permit time varies by city: Oakland’s online permit for remodels with no wall or window changes typically takes 3 days to 2 weeks, and the City of Napa reviews minor interior remodels at the counter. We’ll lay out a schedule for your project at the consultation.
If your home was built before 1994 and the remodel needs a permit, California requires every toilet over 1.6 gallons per flush, showerhead over 2.5 gallons per minute and faucet over 2.2 in the house to be replaced before final approval. Anything you buy new already meets the current, stricter limits.
Yes. We remove the tub and build a shower with a new valve, waterproofing, drain and glass. If it’s the only tub in the house, consider resale first, since some buyers with young children want one.
Yes. An accessible bathroom usually combines a zero-threshold shower, blocking for grab bars, a comfort-height toilet and wider clearances. The Cost vs. Value Report’s accessible version of a 5×7 ft bathroom comes to $52,228 in the San Francisco market.
If the work disturbs more than 6 sq ft of painted surface in a room, federal rules require an EPA-certified firm, lead-safe work practices and EPA’s Renovate Right pamphlet before work starts. Oakland also requires a lead-based paint work plan with the permit.
California caps the down payment at $1,000 or 10% of the contract price, whichever is less, with no exception for special-order materials. After that, payments follow the contract’s schedule and can’t run ahead of the work completed.
Yes. We lay out the bathroom, help with selections, prepare and submit permit drawings when they’re needed, schedule inspections and build through final approval.
Send a few details or call. We’ll talk through what’s possible in your space, whether you’ll need a permit and a realistic budget.
Planning something else? Kitchen remodeling · All remodeling services · ADUs